Tag: HSR

Sunday Train: Sustainable Steam Train? / SF Muni – HSR Disconnect? / A Geary Aerobus?

Burning the Midnight Oil for Living Energy Independence

This week’s Sunday Train is a trio of shorter topics. The first is a research development project to develop a modern steam train to run on biocoal. The target is a sustainable steam train that, as a headline grabber, will attempt to run at 130mph and break the world steam train speed record. There’s much to like about this research development project … but I am going to argue that biocoal to operate trains is not it.

Second, SF’s MUNI transport agency is one of the ten agencies slated to split $760m in Prop1a(2008) bond funds improvements to systems interconnecting with the planned High Speed Rail system. The balance of the $950m goes to the three existing Amtrak California intercity rail services, the Capitol Corridor, the San Joaquin, and the Surfliner.

Odd thing is, the proposal that SF MUNI is setting forward doesn’t actually connect to the proposed HSR system? What’s up with that, after the break.

And third, a speculative look at an alternative technology that SF MUNI might deploy that money on, that actually would connect with the HSR system at the Transbay Terminal, as well as connecting to BART, the MUNI light rail network, the existing (and proposed alternative) Caltrain terminus at 4th and King, and provide express transit service along Geary Blvd.

So instead of the traditional long trip, Sunday Train for Memorial Day Weekend has three short exursions. Join us for one, two, or all three, after the break.

Sunday Train: Faster Trains Yields More Services Per Day

Burning the Midnight Oil for Living Energy Independence

Back in the 29 Nov 2009 Sunday Train, Frequency and Waiting on a Train, I reacted to a point made in John McCommon’s book, Waiting on a Train:

“Once those intermodal trains can go through Stampede Pass, it will take some traffic off the main line and free up more room for additional passenger trains,” said Uznanski.

By bringing the number of trains up to eight a day between Vancouver and Portland, ridership and ticket revenue will increase significantly. Currently ticket sales – what is known as farebox – cover 43% of the Amtrak Cascades’ operating expenses; the state subsidizes the remainder. Run eight trains daily, however, the farebox recovery goes up to 70%.

It’s all about frequency. When trains are frequency and convenient, ridership – particularly business travel – grows dramatically, said Uznanski.

It was a mantra I was to hear from experts all across the country – frequency builds ridership and only frequency significantly builds farebox recovery. Sure its great to have trains running more than 100mph in a corridor, but if there are only a couple of trains a day, they just aren’t convenient enough to move people off the highway or away from the airport.

– John McCommons, Waiting on a Train, Chelsea Green Publishing: Vermont, p. 51

This came back to mind when I was thinking last week about the “Cornhusker Rocket” proposal to reintroduce regular corridor service between Omaha and Chicago via Des Moines, Iowa City and the Quad Cities. Often times, a substantial benefit in getting train speeds up is that ability to operate more services per day with the same number of trains.

Sunday Train: The Rock Island Line is a Mighty Fine Iowa Rapid-Rail Road

Burning the Midnight Oil for Living Energy Independence

The Iowa Department of Transport has just completed the Chicago to Omaha Regional Passenger Rail System Planning Study, to select its preferred alignment for a detailed Environmental Impact Report.

There were five alignments in the study, based on the five historical passenger rail services between Chicago and Omaha. From north to south, these are: the Illinois Central; the Chicago & Northwestern; the Milwaukee Road; the Rock Island Line; and the Burlington Line. The study also included one combined alignment, based on where the Burlington Line and the Rock Island Line cross in Wyanet in western Illinois.

The combined alignment is the one selected, taking the Burlington alignment out of Chicago, and then taking the Rock Island line to Moline in the Quad Cities on the Illinois / Iowa border and through Iowa City and Des Moines to Omaha (probably via Council Bluffs, but that has yet to be determined).  

Sunday Train: Leveraging HSR for a Fresno Regional Rail Corridor

Burning the Midnight Oil for Living Energy Independence

Kings County officials have been opposed all proposed routes:

Board members said no high-speed rail route through Kings County would be acceptable while denouncing the Authority and its Fresno-to-Bakersfield environmental impact report.

“I think we should come out and oppose high-speed rail in Kings County, no matter what alignment they have,” said Supervisor Tony Barba during a discussion of the county’s official response to the EIR, which is due Thursday. He was applauded by a large crowd that nearly filled the Board of Supervisors’ chambers at the Kings County Government Center.

And then they opposed getting started on California HSR:

HANFORD – Kings County supervisors on Tuesday will likely ask three key legislators to delay high-speed rail funding until the project resolves local conflicts.



The Legislature is expected to vote in June whether to spend $2.7 billion in state bond money on the project, which has created major controversy in the San Joaquin Valley and stoked opposition from several cities and counties who believe it should be scrapped.

Denying the funding would stop the Authority from starting construction in Fresno later this year or in early 2013.

And now, County officials seek to preserve Amtrak :



But Authority officials have recently entered into discussions with Kings County to see if Amtrak service through Hanford and Corcoran can be preserved, said Larry Spikes, Kings County administrative officer. Downtown stations are considered critical to cities’ local economy.

Authority Board Chairman Dan Richard couldn’t be reached for comment.

“Taking Amtrak right out of the heart of Hanford and Corcoran is just not a good idea,” Spikes said.

So, don’t want the HSR Station in town, don’t want the HSR to go outside of town, and wants Amtrak to be continued to Hanford and Corcoran at slow speed when the San Joaquin after the high speed route between Merced and Bakersfield becomes available.

What I am looking in this week’s Sunday Train is a different way to go about this that provides a mix of local and intercity transport benefits to the major county centers: the Fresno Regional Rail Corridor.

Sunday Train: Should Cap&Trade Funds finance the California HSR?

Burning the Midnight Oil for Living Energy Independence

One element of the recent California HSR “revised” draft 2012 Business Plan (which we shall call the Other, Other Plan) involves looking to one particular means of finance in addition to general fund bond finance and Federal transport grant funding:

Cap-and-Trade Program Funds

Assembly Bill 32 (Statutes, 2006, Chapter 488) mandates a reduction of statewide greenhouse gas emissions to 1990 levels by 2020. In accordance with that law, California will implement a market-based cap-and-trade program. Funds from the program can be used to further the purposes of AB 32, including for development and construction of the high-speed rail system.

This has led to the current controversy in which the California Legislative Analysts Office, the LAO, has argued that the Cap and Trade funds might not be usable for HSR (pdf: p. 8).

One of their points, “Other GHG Reduction Strategies Likely to Be More Cost Effective,” involves a serious and common misframing of the question of the use of funds dedicated to reducing Greenhouse Gas Emissions: when reducing GHG emissions in a project that serves multiple purposes, the cost effectiveness of the GHG emissions spending depends on what share of the project funding is represented by that GHG emissions spending.

So more on transport, Green House Gas emissions, and the peculiar analytical weaknesses that crop up whenever the California LAO turns its attention to HSR, over the fold.

Sunday Train: The Miami/Orlando Passenger Rail Project

Burning the Midnight Oil for Living Energy Independence

I saw this story a couple of weeks ago, but between the happenings in California and some unanswered questions I had, I haven’t mentioned it yet. Florida East Coast Industries plans Miami-Orlando passenger service by 2014:

Passenger train service between Miami and Orlando could begin as early as 2014 under a plan announced Thursday by Florida East Coast Industries.

The new “All Aboard Florida” service, which would be privately owned and operated, would offer frequent, regularly scheduled daily trains geared to business travelers and tourists. The Miami-Orlando trip by rail would take three hours, about the same time it takes by car via Florida’s Turnpike.

There would be four stops: Miami, Fort Lauderdale, West Palm Beach and Orlando, each with connections to airports, seaports and existing rail systems such as Tri-Rail and Metrorail. The trains would run on existing FEC tracks that stretch along the east coast from Miami to Cocoa. Forty miles of new track would link Cocoa to Orlando.

Well, waddya know ~ a Passenger Train that Rick Scott can’t kill. More about the Miami/Orlando Train, below the fold.

Sunday Train: Did Governor Brown Save California’s HSR?

Burning the Midnight Oil for Living Energy Independence

As I mentioned in last week’s Sunday Train, the California HSR Authority came out with a revised draft Business Plan.

And why do you revise a draft Business Plan? Because some people suggested some modifications to your previous draft Business Plan might be in order … for instance, if there’s a possibility that you cannot get bonds authorized to start work on the part of the corridor where the Federal Government has already put some funding on the table.

The new, revised, draft Business Plan seems to mark the final passing of the baton from the Judge Kopp absolutist vision of the what an HSR “simply has to be” to the more grounded, realistic vision of Governor Brown …

… and in the process of dragging the HSR Authority back into touch with reality, it is quite possible that Governor Brown has saved the California HSR project.

There are two qualifiers here. The first is that without an account of someone privy to the details of the Governor’s intervention, we won’t know what changes were things the California HSR was on track to doing anyway, and what changes were pushed upon them. But even there, what “the HSR Authority wanted to do” was likely heavily influenced by the changing of the guard from Schwarzenegger appointees to Brown appointees at the Authority.

The second is that getting to work is not yet a done deal. Supporters of the project ~ whether ongoing supporters or those won over by the newly revised plan ~ still need to work to help see the project through to construction of the first construction segment.

The devil is in the details, so we go chasing the devil below the fold.

Sunday Train: HSR & the Slow Trains of No. California

The headlines out of California indicate that there has been a substantial shift in terms of the California HSR system. In particular, it seems that Gov. Brown has waded into the fray and is reframing the issue from the Only-An-Infrastructure-Geek-Could-Love frame of the Initial Construction Segment and the mythical “Train to Nowhere”, to the “when do I get to ride it?” frame of the Initial Operating Service.

You can find the lead up to the big move at the CHSRblog:

Deal Reached to Combine Caltrain Electrification and HSR (22MAR)

Legislature Appears to Have Votes to Approve HSR Funding (23MAR)

Jerry Brown Lowers HSR Cost by $30 billion

And Newspaper sneak previews of what will be Monday’s Big News at:

Sacramento Bee: Gov. Jerry Brown to change high-speed rail plan, lower cost by $30

Mercury News: Questions remain despite revised Calif. rail plan  

SF Chronicle: High-speed rail plan slashes costs to calm critics

However, while the newspaper accounts given glimpses and hints and quotes of very carefully written statements from the principle actors … digging into the details will have to wait until the details are released.

So instead, I want to take a look at the existing “Slow Speed Rail” systems of Northern California, to get a better background understanding of what “connecting with” the existing systems might mean.

Sunday Train: The Texas Wishbone Regional High Speed Rail

Burning the Midnight Oil for Living Energy Independence

Back in the 90’s, Texas tried to get an Express HSR system off the ground (that is, a bullet train system somewhere in the 125mph to 220mph range) with the “Texas Triangle” project. It was to be an entirely privately funded project. Not surprisingly, competing against the heavily  publicly subsidized interstate highway and air travel systems, it did not get off the ground.

More recently, the Texas T-Bone was proposed, based on the Dallas to San Antonio leg of the Triangle and a route from Houston to Temple, then running north to Dallas with connections south to Austin and San Antonio.

While the Texas T-Bone seems to be the current plan of the Texas High Speed Rail and Transportation Corporation, this is more of an advocacy group than an official HSR Commission or Rail Development Commission.

Given that we are in between periods of substantial federal funding for High Speed Rail, I thought this might be a good time to take a look at the prospects for Regional HSR, in some of the existing rail corridors within the “Texas Triangle” region … and so arrived at the Texas Wishbone.

Sunday Train: Pushing for a Rapid Rail HSR Station in Ravenna, Ohio

Burning the Midnight Oil for Living Energy Independence

OK, now, thanks to John Kasich, we are not going to get started on that Rapid Rail HSR network before 2015. Indeed, Democrats would probably have to take back one of the two Chambers of the State Legislature to be able to hit the ground running on getting that Rapid Rail HSR network going in 2015.

On the other hand, if you never lay the foundation, you always end up with an outcome you don’t like.

And I don’t like the way that the Ohio Hub connects to Summit and Portage Counties, so I want to work on how to get a station in Ravenna added to the Ohio Hub.

The reason its on the Sunday Train is threefold: maybe somebody can give me a great tip; maybe somebody can get an idea for something they can work on where they live; and its about making more sustainable transport options available to a medium city and a variety of inner and outer suburban landscapes.

Load more